01 / Federal Opportunity Brief
Coastwide Beach and Dune Ecosystem Restoration
02 / Federal Buyer
Who is buying?
03 / Purchase
What is the government buying?
Coastwide Beach and Dune Ecosystem Restoration
The current notice is soliciting this requirement from eligible offerors.
The specification describes restoring dunes by populating the proposed dune footprint with dune vegetation using a planting scheme intended to naturally accumulate sand and promote natural dune building. Planting is completed following sand fence installation, and sand fencing and plantings are designed to promote additional growth of the dune system by disrupting windblown sand flow.
Not disclosed in the provided evidence.
Not disclosed in the provided evidence.
04 / Contracting Requirements
How will this procurement work?
| Requirement | What the notice says | Source status |
|---|---|---|
| Eligibility | The solicitation is an 8(a) set-aside under FAR 19.8. | Confirmed |
| Contract ceiling | Not disclosed | Not Disclosed |
| Minimum guarantee | Not disclosed | Not Disclosed |
| Contract duration | Not disclosed | Not Disclosed |
| Foreign participation | Not disclosed | Not Disclosed |
| Proposal and award procedure | Not disclosed in the provided evidence (no evaluation procedure or submission instructions shown). | Not Disclosed |
| Staffing and security | Not disclosed in the provided evidence. | Not Disclosed |
Read the original SAM.gov description
The intent of this specification is to populate the proposed dune footprint with dune vegetation in a planting scheme that will naturally accumulate sand and promote natural dune building. Planting will be completed following the sand fence installation. Sand fencing and plantings are designed to promote additional growth of the dune system by disrupting the flow of windblown sand.
05 / Historical Spending Trend
How has spending on the selected comparable contracts changed?
The same closed fiscal-year window and the same complete comparable-contract set are used throughout this Brief. Net obligations total $37.36M across 3 fiscal years.

| Fiscal year | Comparable obligations | Actions | Vendors |
|---|---|---|---|
| FY 2023 | $260.9K | 1 | 1 |
| FY 2024 | -$6.9K | 1 | 1 |
| FY 2025 | $37.10M | 1 | 1 |
06 / Related Historical Awards
Which contracts support the comparison?
No direct contract reference was found. 2 broad matches are shown as supporting context.

| Contract | Vendor | Latest activity | Office | NAICS / PSC | Match | Obligations | Actions |
|---|---|---|---|---|---|---|---|
| W9127826CA001 | JBW GROUP LLC | Dec 1, 2025 | W074 ENDIST MOBILE | 237990 / Y1KF | Broad match Buyer and requirement-language evidence | $37.10M | 1 |
| W9127823F0172 | CEC-CDM SMITH, A JOINT VENTURE | May 15, 2023 | W074 ENDIST MOBILE | 541330 / C211 | Broad match Buyer and requirement-language evidence | $260.9K | 1 |
07 / Contractor Evidence
Which contractors have performed related work?
Historical contractors are ranked by direct procurement-family evidence and comparable contract activity. The table distinguishes connected holders from broader performers without identifying unverified bidders.
No directly connected predecessor was identified. The companies below are historical performers selected from the comparable contract set; none is identified as a bidder.

| Company | Evidence | Fit | Why included | Contracts | Actions | Obligations | Latest activity | Links |
|---|---|---|---|---|---|---|---|---|
| JBW GROUP LLC UEI RYENYEUPVKA8 · CAGE 959V0 | Broad historical performer Historical performer | Moderate | Comparable buyer and requirement history | 1 | 1 | $37.10M | Dec 1, 2025 | GETWAB profile Verified via SAM Entities Official website |
| CEC-CDM SMITH, A JOINT VENTURE UEI C4TMH1B9X6A4 · CAGE 869Y8 | Broad historical performer Historical performer | Moderate | Comparable buyer and requirement history | 1 | 1 | $260.9K | May 15, 2023 | GETWAB profile |
08 / Competitive Landscape
How was comparable work competed?
Competition treatment is calculated from exactly the same closed-period contract set used in Sections 5–7. It describes historical actions, not the outcome of this solicitation.

| FPDS treatment | Code | Actions | Obligations | Share |
|---|---|---|---|---|
| Not available for competition | B | 1 | $37.10M | 99.3% |
| Full and open after exclusion of sources | D | 2 | $254.0K | 0.7% |
09 / Procurement History
How was this opportunity published and updated?
One SAM.gov notice record was resolved for this procurement family.
| Notice | Type | Posted | Response deadline | Status | Official source |
|---|---|---|---|---|---|
| W9127826RA011 Current Brief record Coastwide Beach and Dune Ecosystem Restoration | Solicitation | Sep 28, 2026 | Oct 30, 2026 12:00 PM GMT-0500 | Active | View on SAM.gov |
10 / NAICS and PSC Market Context
How large is the selected comparable market?
Classification codes organize the evidence; they do not prove that every contract in the broader NAICS or PSC market matches this requirement.
11 / Capture Signals and Risks
What should be validated before committing capture resources?
Capture signals separate verified procurement-family evidence from unresolved requirements and market-only indicators.
Direct procurement-family evidence
No direct award record found
Buyer proximity
2 comparable record(s) share the contracting office
Eligibility
8(a) Set-Aside (FAR 19.8)
Unresolved requirement fields
6
12 / Who Should Pursue
When does this opportunity fit?
- Your team can demonstrate recent, relevant delivery in Coastwide Beach and Dune Ecosystem Restoration.
- Your company can document the stated eligibility conditions: The solicitation is an 8(a) set-aside under FAR 19.8.
- You can show credible past performance for W074 ENDIST MOBILE or a closely related federal customer.
- Your technical scope fits, but you lack demonstrated history with W074 ENDIST MOBILE.
- You need a specialist teammate to close unresolved staffing, security, or detailed-scope requirements before committing.
- You cannot satisfy or verify the stated eligibility conditions: The solicitation is an 8(a) set-aside under FAR 19.8.
- The unresolved requirements shown above cannot be validated before committing proposal resources.



