Agency code 8000

THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) IS SEEKING INDUSTRY SUPPORT TO.DEVELOP A PATHWAY FOR HUMAN SPACEFLIGHT INTO CIS-LUNAR SPACE AND FOR THE HABITATION OF PLANETARY.BODIES. NASA IS SPECIFICALLY WORKING TOWARDS THE CAPABILITY TO SUSTAINABLY LIVE SAFELY BEYOND.THE EARTH. IN-SITU RESOURCE UTILIZATION (ISRU), THE PRODUCTION OF MISSION CRITICAL CONSUMABLES ON.PLANETARY BODIES USED FOR HUMAN EXPLORATION THAT WOULD OTHERWISE BE BROUGHT FROM EARTH, HAS.BEEN IDENTIFIED BY NASA AS AN EXPLORATION ELEMENT THAT HAS NO FLIGHT PRECEDENT. THE NASA.NEXTSTEP-2 BAA (ISRU BAA) SEEKS CONCEPTS FOR THE FABRICATION AND TESTING OF CRITICAL ISRU.COMPONENTS FOR PROCESSING OF EXTRATERRESTRIAL RESOURCES INTO WATER, OXYGEN, AND FUEL..IN RESPONSE TO THE ISRU BAA, TELEDYNE ENERGY SYSTEMS, INC. (TESI) PROPOSES TO ADDRESS THE.PRODUCTION OF OXYGEN AND FUEL FROM EXTRATERRESTRIAL RESOURCES, SPECIFICALLY THE GENERATION OF.OXYGEN AND FUEL FROM ICE THAT IS MINED FROM THE MOON OR MARS. TO REALIZE THE PRODUCTION OF.OXYGEN AND FUEL FROM EXTRATERRESTRIAL RESOURCES, TESI PROPOSES THE DEVELOPMENT AND TESTING (IN A.RELEVANT ENVIRONMENT) OF AN ALKALINE WATER ELECTROLYZER. THE ALKALINE WATER ELECTROLYZER IS BASED.ON A COMMERCIAL DUAL IRRIGUOUS (DUAL-FEED/ FLOODED) SYSTEM EXCLUSIVELY SOLD BY TESI. ONE.ADVANTAGE OF THE PROPOSED ELECTROLYSIS SYSTEM OVER OTHERS THAT HAVE BEEN FUNDED BY NASA IS IN.THE MINIMAL PROCESSING (CLEAN-UP) REQUIRED OF ISRU WATER FEEDSTOCK FOR USE IN AN ELECTROLYSIS.SYSTEM. THE ADVANCED ELECTROLYZER IS EXPECTED TO PRODUCE 1.1 KG OF OXYGEN PER HOUR IN THE.RANGE OF 6.2 TO 6.7 KW, DELIVERING A KEY METRIC OF 5.6 TO 6.1 W/(KG O2/HR). THE GOAL OF THIS.PROPOSED EFFORT IS TO DEMONSTRATE AN ELECTROLYSIS SYSTEM THAT CAN SUPPORT THE MAXIMUM LEVEL OF.CONTAMINANTS FOUND IN ISRU WATER FEED STOCK AND PRODUCE OXYGEN AND FUEL AT THE LOWEST ENERGY.POSSIBLE. IF SUCCESSFUL, THIS EFFORT WOULD PROVIDE NASA WITH A ROBUST SOLUTION FOR GENERATING.OXYGEN AND FUEL ON PLANETARY BODIES BEYOND EARTH..TO DEVELOP THE PROPOSED ALKALINE ELECTROLYZER, TESI WILL INITIATE SINGLE-CELL ELECTROLYSIS STUDIES.USING A TESTBED PREVIOUSLY DEVELOPED TO SUPPORT A DEPARTMENT OF ENERGY (DOE) EFFORT. THE.SINGLE CELLS WILL BE PARAMETRICALLY STUDIED AS A FUNCTION OF OPERATING TEMPERATURE, OPERATING.PRESSURE, AND CONTAMINANT CONCENTRATION. INITIAL CONTAMINATES WILL BE BASED ON SIMPLE SPECIES.THAT ARE TYPICAL OF THAT EXPECTED IN ISRU WATER FEED STOCK THAT IS MINED FROM ICE ON THE MOON OR.MARS. THIS WILL BE DONE TO UNDERSTAND THE EFFECTS OF EACH CONTAMINANT SPECIES ON ELECTROLYZER.DURABILITY. THE FINAL SINGLE-CELL EVALUATION WILL BE BASED ON A SIMULATED ISRU WATER.FEEDSTOCK PROVIDED BY NASA. AT THE COMPLETION OF SINGLE-CELL ELECTROLYZER TESTING, A 10-CELL.STACK WILL BE FABRICATED FOR TESTING IN A RELEVANT ENVIRONMENT. ALTHOUGH NOT A FOCUS OF THE ISRU.BAA, THE STACK WILL BE DESIGNED FOR OPERATION AT 3,600 PSIG. THIS ELECTROLYSIS SYSTEM WILL FORM.THE BASIS OF AN OXYGEN GENERATOR THAT CAN BETTER INTEGRATE WITH THE ENVIRONMENTAL CONTROL AND LIFE.SUPPORT SYSTEMS (ECLSS) OF A CREWED SPACECRAFT OR HABITAT. IT IS TESI'S HOPE THAT THE PROPOSED.ELECTROLYZER MAY SERVE AS A MODULAR SYSTEM FOR ISRU, ECLSS, REGENERATIVE FUEL CELLS (RFCS),.AND OUR COMMERCIAL ACTIVITIES..

02 / Contract Size and Status

What is the recorded size and timing of this contract?

Net obligations$1.14M
Contract actions19
Potential value-$1
Latest actionNov 12, 2024
Effective dateMay 2, 2019
Completion dateSep 1, 2023
NAICS markets1
PSC categories1

03 / Spending Trend

80HQTR19C0023 contract spending by fiscal year

Annual net obligations across the complete period available for this agency and PIID, from the first recorded fiscal year through the latest contract action.

Latest fiscal year obligations-$1
FY 2024
Net obligationsComplete recorded range
Fiscal yearNet obligationsActionsChange
FY 2019$852.3K4
FY 2020$113.6K2−86.7%
FY 2021$131.0K6+15.2%
FY 2022$45.8K3−65.1%
FY 2023$03−100.0%
FY 2024-$11

04 / Federal Buyer

Which organization manages this contract?

05 / Contractor

Who holds this federal contract?

TELEDYNE ENERGY SYSTEMS, INC.

UEI EKLDZ9NC5BQ6 · CAGE 0RTN5

06 / NAICS Industries

Which industries classify this contract?

CodeDescriptionObligationsActionsShare
541715RESEARCH AND DEVELOPMENT IN THE PHYSICAL, ENGINEERING, AND LIFE SCIENCES (EXCEPT NANOTECHNOLOGY AND BIOTECHNOLOGY)$1.14M19100.0%

07 / Products and Services

What products or services were purchased?

CodeDescriptionObligationsActionsShare
AR91R&D- SPACE: OTHER (BASIC RESEARCH)$1.14M19100.0%

08 / Place of Performance

Where is the work recorded?

HUNT VALLEY, BALTIMORE, MARYLAND, UNITED STATES

ZIP 210311326

09 / Contract Actions

What modifications and obligations were recorded?

Signed dateModificationObligationContracting officeNAICSPSC
Nov 12, 2024P00018-$1NASA HEADQUARTERSOffice code 80HQTR541715AR91
Jun 28, 2023P00017$0NASA HEADQUARTERSOffice code 80HQTR541715AR91
Apr 27, 2023P00016$0NASA HEADQUARTERSOffice code 80HQTR541715AR91
Feb 1, 2023P00015$0NASA HEADQUARTERSOffice code 80HQTR541715AR91
Sep 14, 2022P00013$0NASA HEADQUARTERSOffice code 80HQTR541715AR91
Sep 14, 2022P00014$45.8KNASA HEADQUARTERSOffice code 80HQTR541715AR91
Jun 14, 2022P00012$0NASA HEADQUARTERSOffice code 80HQTR541715AR91
Oct 19, 2021P00011$0NASA HEADQUARTERSOffice code 80HQTR541715AR91
Sep 1, 2021P00010$0NASA HEADQUARTERSOffice code 80HQTR541715AR91
Jun 2, 2021P00009$0NASA HEADQUARTERSOffice code 80HQTR541715AR91
May 25, 2021P00008$109.7KNASA HEADQUARTERSOffice code 80HQTR541715AR91
Apr 29, 2021P00007$0NASA HEADQUARTERSOffice code 80HQTR541715AR91
Apr 20, 2021P00006$21.3KNASA HEADQUARTERSOffice code 80HQTR541715AR91
Nov 13, 2020P00005$0NASA HEADQUARTERSOffice code 80HQTR541715AR91
Feb 24, 2020P00004$113.6KNASA HEADQUARTERSOffice code 80HQTR541715AR91

10 / Reading the Contract

How should this award record be interpreted?

Read the PIID as a transaction history, not as a single purchase price. Net obligations combine the base action with later increases, reductions, corrections, and deobligations recorded under the same contract.

01

Verify the buyer

Agency and office identify who manages the procurement relationship.

02

Follow modifications

Each action can change funding, scope, dates, or administrative terms.

03

Compare the market

Use NAICS, PSC, and the contractor profile to identify related buyers and competitors.