COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. NUSTAR IS A PRINCIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED. 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
02 / Contract Size and Status
What is the recorded size and timing of this contract?
03 / Spending Trend
NNG08FD60C contract spending by fiscal year
Annual net obligations across the complete period available for this agency and PIID, from the first recorded fiscal year through the latest contract action.
| Fiscal year | Net obligations | Actions | Change |
|---|---|---|---|
| FY 2008 | $16.75M | 7 | — |
| FY 2009 | $29.92M | 15 | +78.6% |
| FY 2010 | $23.40M | 5 | −21.8% |
| FY 2011 | $21.04M | 9 | −10.1% |
| FY 2012 | $8.63M | 5 | −59.0% |
| FY 2013 | $714.0K | 1 | −91.7% |
| FY 2014 | $1.88M | 8 | +163.1% |
| FY 2015 | $3.30M | 4 | +75.7% |
| FY 2016 | $5.14M | 7 | +55.8% |
| FY 2017 | $1.72M | 3 | −66.5% |
| FY 2018 | $900.0K | 2 | −47.8% |
| FY 2019 | $4.56M | 9 | +406.6% |
| FY 2020 | $2.55M | 2 | −44.2% |
| FY 2021 | $2.90M | 3 | +13.9% |
| FY 2022 | $4.16M | 5 | +43.5% |
| FY 2023 | $2.78M | 3 | −33.2% |
| FY 2024 | $3.32M | 3 | +19.6% |
| FY 2025 | $3.90M | 6 | +17.3% |
| FY 2026 | $1.83M | 2 | −53.0% |
04 / Federal Buyer
Which organization manages this contract?
| Department | Contracting agency | Contracting office |
|---|---|---|
| NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION | NASA GODDARD SPACE FLIGHT CENTER |
05 / Contractor
Who holds this federal contract?
UEI U2JMKHNS5TG4 · CAGE 80707
06 / NAICS Industries
Which industries classify this contract?
| Code | Description | Obligations | Actions | Share |
|---|---|---|---|---|
| 611310 | COLLEGES, UNIVERSITIES, AND PROFESSIONAL SCHOOLS | $139.39M | 99 | 100.0% |
07 / Products and Services
What products or services were purchased?
| Code | Description | Obligations | Actions | Share |
|---|---|---|---|---|
| AR93 | R&D- SPACE: OTHER (ADVANCED DEVELOPMENT) | $139.39M | 99 | 100.0% |
08 / Place of Performance
Where is the work recorded?
ZIP 911250600
09 / Contract Actions
What modifications and obligations were recorded?
10 / Reading the Contract
How should this award record be interpreted?
Read the PIID as a transaction history, not as a single purchase price. Net obligations combine the base action with later increases, reductions, corrections, and deobligations recorded under the same contract.
Verify the buyer
Agency and office identify who manages the procurement relationship.
Follow modifications
Each action can change funding, scope, dates, or administrative terms.
Compare the market
Use NAICS, PSC, and the contractor profile to identify related buyers and competitors.