01 / Federal Opportunity Brief
Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement
02 / Federal Buyer
Who is buying?
03 / Purchase
What is the government buying?
Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement
The current notice is soliciting this requirement from eligible offerors.
The project involves replacing the existing bridge with a new fixed single-span steel girder bridge with a concrete deck, including partial demolition of the existing bridge. The new bridge will be 34’4½” wide with two 11’0” travel lanes, two 2’0” shoulders, and a 5’0” sidewalk. Additional Government Furnished Information (Power Line Layout) is provided for contractor information and must be field verified. The scope is partially confirmed as the full scope details are not provided.
Not disclosed in the provided evidence.
Not disclosed in the provided evidence.
04 / Contracting Requirements
How will this procurement work?
| Requirement | What the notice says | Source status |
|---|---|---|
| Eligibility | This is a total small business set-aside. | Confirmed |
| Contract ceiling | Not disclosed | Not Disclosed |
| Minimum guarantee | Not disclosed | Not Disclosed |
| Contract duration | Not disclosed | Not Disclosed |
| Foreign participation | Not disclosed | Not Disclosed |
| Proposal and award procedure | Not disclosed in the provided evidence. | Not Disclosed |
| Staffing and security | Not disclosed in the provided evidence. | Not Disclosed |
Read the original SAM.gov description
*** 27 August 2026 - Amendment W9127N26BA0240001 Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement*** This amendment inserts additional Government Furnished Information (GFI) as an attachment to the solicitation. The file “Power Line Layout” is provided for the Contractor’s information. The Government shall not be responsible for any interpretation of, or conclusion drawn, from the data or information by the Contractor. Information provided should be field verified by the Contractor. If there is a discrepancy between the solicitation plan set and the GFI, the solicitation plan set takes precedence. The project consists of replacing the existing bridge with a new fixed bridge on a new alignment and to provide for partial demolition of the existing bridge. The new fixed bridge will be a single-span steel girder bridge with a concrete deck. The bridge width will be 34’4½” out-to-out, with two 11’0” travel lanes, two 2’0” shoulders, a 5’0” sidewalk, and the superstructure will consist of four (4) built-up steel plate girders. The replacement bridge alignment is located immediately downstream of the existing bridge and, at its northern terminus, will fit entirely between the existing bridge and the Bonneville Power Administration transmission tower which is located to the south. Approach roadways will also be constructed to tie into the existing roadway alignment. The new fixed bridge will be located over the existing navigation channel and will provide an under clearance that is larger than is currently present under the existing bridge. The north abutment will be a concrete stub abutment with spread footing anchored into rock. The south abutment will be a concrete abutment that is supported by drilled shafts. To mitigate seismic hazards, portions of the existing bridge will be removed as part of the bridge construction requirement. The existing bridge provides for critical vehicular access to the Bonneville project that must remain open for the entirety of the construction project. This will likely require the contractor to construct the project in phases. In addition, lead and asbestos removal will be required as part of this requirement. Working within environmental and seasonal restrictions and barge crane lifting will be required in close proximity to a high voltage power line will also be necessary during performance of the required work.
05 / Historical Spending Trend
How has spending on the selected comparable contracts changed?
The same closed fiscal-year window and the same complete comparable-contract set are used throughout this Brief. Net obligations total $8.08M across 7 fiscal years.

| Fiscal year | Comparable obligations | Actions | Vendors |
|---|---|---|---|
| FY 2019 | $5.96M | 16 | 5 |
| FY 2020 | $847.1K | 9 | 5 |
| FY 2021 | $233.9K | 5 | 4 |
| FY 2022 | $169.3K | 6 | 4 |
| FY 2023 | $138.9K | 5 | 1 |
| FY 2024 | $395.3K | 8 | 5 |
| FY 2025 | $335.0K | 9 | 6 |
06 / Related Historical Awards
Which contracts support the comparison?
No direct contract reference was found. 15 broad matches are shown as supporting context.

| Contract | Vendor | Latest activity | Office | NAICS / PSC | Match | Obligations | Actions |
|---|---|---|---|---|---|---|---|
| W9127N19C0003 | NORTHBANK CIVIL AND MARINE, INC. | Sep 18, 2019 | W071 ENDIST PORTLAND | 237990 / Z2KA | Broad match Buyer and requirement-language evidence | $1.89M | 1 |
| W9127N21P0148 | NEXUS CONTROLS LLC | Sep 30, 2021 | W071 ENDIST PORTLAND | 811211 / J059 | Broad match Buyer and requirement-language evidence | $12.3K | 1 |
| W9127N26PA003 | COLUMBIA RIVER DISPOSAL, INC. | Nov 28, 2025 | W071 ENDIST PORTLAND | 562111 / S205 | Broad match Buyer and requirement-language evidence | $6.6K | 1 |
| W9127N24F0115 | MICROTECHNOLOGIES LLC | Sep 12, 2024 | W071 ENDIST PORTLAND | 334111 / 7G21 | Broad match Buyer and requirement-language evidence | $22.1K | 1 |
| W9127N24P0080 | AANTILIA LLC | Aug 21, 2024 | W071 ENDIST PORTLAND | 335312 / 6105 | Broad match Buyer and requirement-language evidence | $189.0K | 1 |
| W9127N24P0104 | SCOFIELD GROUP, LLC | Aug 9, 2024 | W071 ENDIST PORTLAND | 238290 / N099 | Broad match Buyer and requirement-language evidence | $49.0K | 1 |
| W9127N24P0092 | HYDRO-WATES, INC. | Jul 23, 2024 | W071 ENDIST PORTLAND | 238290 / N099 | Broad match Buyer and requirement-language evidence | $0 | 2 |
| W9127N18P0097 | CROWN POINT REFUSE & RECYCLING INC | Mar 25, 2021 | W071 ENDIST PORTLAND | 562111 / S205 | Broad match Buyer and requirement-language evidence | $172.4K | 3 |
| W9127N15C0009 | RELAY RESOURCES | Apr 10, 2020 | W071 ENDIST PORTLAND | 561720 / S201 | Broad match Buyer and requirement-language evidence | -$2.0K | 2 |
| W9127N15P0031 | COLUMBIA RIVER DISPOSAL, INC. | Mar 28, 2019 | W071 ENDIST PORTLAND | 562111 / S205 | Broad match Buyer and requirement-language evidence | $21.3K | 1 |
| W9127N18C0015 | ANC CUSTODIAL SERVICES, LLC | Jan 31, 2019 | W071 ENDIST PORTLAND | 561730 / S208 | Broad match Buyer and requirement-language evidence | $53.8K | 1 |
| W9127N21C0008 | CENTRIC ELEVATOR CORP OF OREGON INC | Dec 31, 2025 | W071 ENDIST PORTLAND | 811310 / J035 | Broad match Buyer and requirement-language evidence | $72.1K | 1 |
| W9127N25FA017 | VEOLIA ES TECHNICAL SOLUTIONS, L.L.C. | Oct 29, 2025 | W071 ENDIST PORTLAND | 562211 / S222 | Broad match Buyer and requirement-language evidence | $7.3K | 2 |
| W9127N25CA043 | PATTI ENGINEERING INC | Jun 30, 2025 | W071 ENDIST PORTLAND | 423430 / 7B22 | Broad match Buyer and requirement-language evidence | $95.9K | 1 |
| W9127N25PA012 | T & T MATERIALS INC | Apr 21, 2025 | W071 ENDIST PORTLAND | 332313 / 9535 | Broad match Buyer and requirement-language evidence | $13.1K | 1 |
07 / Contractor Evidence
Which contractors have performed related work?
Historical contractors are ranked by direct procurement-family evidence and comparable contract activity. The table distinguishes connected holders from broader performers without identifying unverified bidders.
No directly connected predecessor was identified. The companies below are historical performers selected from the comparable contract set; none is identified as a bidder.

| Company | Evidence | Fit | Why included | Contracts | Actions | Obligations | Latest activity | Links |
|---|---|---|---|---|---|---|---|---|
| NORTHBANK CIVIL AND MARINE, INC. UEI PUVYFG5N1NH8 · CAGE 73PP1 | Broad historical performer Historical performer | Moderate | Comparable buyer and requirement history | 1 | 1 | $1.89M | Sep 18, 2019 | GETWAB profile |
| AANTILIA LLC UEI M1WNFFFKYSX6 · CAGE 8EQ30 | Broad historical performer Historical performer | Moderate | Comparable buyer and requirement history | 1 | 1 | $189.0K | Aug 21, 2024 | GETWAB profile Verified via SAM Entities Official website |
| CROWN POINT REFUSE & RECYCLING INC UEI LL7TVN35A8W5 · CAGE 1QTJ4 | Broad historical performer Historical performer | Moderate | Comparable buyer and requirement history | 1 | 3 | $172.4K | Mar 25, 2021 | GETWAB profile Verified via SAM Entities Official website |
| PATTI ENGINEERING INC UEI ZSN3NER7TM93 · CAGE 5TEM8 | Broad historical performer Historical performer | Moderate | Comparable buyer and requirement history | 1 | 1 | $95.9K | Jun 30, 2025 | GETWAB profile Verified via SAM Entities Official website |
| CENTRIC ELEVATOR CORP OF OREGON INC UEI KU2AQHM35MQ7 · CAGE 089P4 | Broad historical performer Historical performer | Moderate | Comparable buyer and requirement history | 1 | 1 | $72.1K | Dec 31, 2025 | GETWAB profile Verified via SAM Entities Official website |
| ANC CUSTODIAL SERVICES, LLC UEI M4FRXBWPGG21 · CAGE 6UWF0 | Broad historical performer Historical performer | Moderate | Comparable buyer and requirement history | 1 | 1 | $53.8K | Jan 31, 2019 | GETWAB profile |
| SCOFIELD GROUP, LLC UEI KFVEV521GBT8 · CAGE 9XFB5 | Broad historical performer Historical performer | Moderate | Comparable buyer and requirement history | 1 | 1 | $49.0K | Aug 9, 2024 | GETWAB profile Verified via SAM Entities Official website |
| COLUMBIA RIVER DISPOSAL, INC. UEI R6KYFQ9FHER6 · CAGE 7B8X9 | Broad historical performer Historical performer | Moderate | Comparable buyer and requirement history | 2 | 2 | $27.9K | Nov 28, 2025 | GETWAB profile |
| MICROTECHNOLOGIES LLC UEI CL69E7KATK59 · CAGE 3TSJ0 | Broad historical performer Historical performer | Moderate | Comparable buyer and requirement history | 1 | 1 | $22.1K | Sep 12, 2024 | GETWAB profile Verified via SAM Entities Official website |
| T & T MATERIALS INC UEI G8BEYPJRQQK5 · CAGE 4ETZ7 | Broad historical performer Historical performer | Moderate | Comparable buyer and requirement history | 1 | 1 | $13.1K | Apr 21, 2025 | GETWAB profile Verified via SAM Entities Official website |
| NEXUS CONTROLS LLC UEI VTALDFW49638 · CAGE 5YGH0 | Broad historical performer Historical performer | Moderate | Comparable buyer and requirement history | 1 | 1 | $12.3K | Sep 30, 2021 | GETWAB profile |
| VEOLIA ES TECHNICAL SOLUTIONS, L.L.C. UEI NA8DN89KAXY8 · CAGE 3C7H6 | Broad historical performer Historical performer | Moderate | Comparable buyer and requirement history | 1 | 2 | $7.3K | Oct 29, 2025 | GETWAB profile Verified via SAM Entities Official website |
| RELAY RESOURCES UEI GCEKTL3BRG91 · CAGE 5S669 | Broad historical performer Historical performer | Moderate | Comparable buyer and requirement history | 1 | 2 | -$2.0K | Apr 10, 2020 | GETWAB profile Verified via SAM Entities Official website |
| HYDRO-WATES, INC. UEI YCYZY5NQLTK7 · CAGE 5Y9D6 | Broad historical performer Historical performer | Moderate | Comparable buyer and requirement history | 1 | 2 | $0 | Jul 23, 2024 | GETWAB profile |
08 / Competitive Landscape
How was comparable work competed?
Competition treatment is calculated from exactly the same closed-period contract set used in Sections 5–7. It describes historical actions, not the outcome of this solicitation.

| FPDS treatment | Code | Actions | Obligations | Share |
|---|---|---|---|---|
| Full and open after exclusion of sources | D | 12 | $6.57M | 81.4% |
| Competed under simplified acquisition procedures | F | 35 | $1.47M | 18.3% |
| Full and open competition | A | 1 | $22.1K | 0.3% |
| Not competed under simplified acquisition procedures | G | 10 | $8.8K | 0.1% |
09 / Procurement History
How was this opportunity published and updated?
3 SAM.gov notice records were resolved into this procurement family. The chronology shows how the requirement was published and updated.
| Notice | Type | Posted | Response deadline | Status | Official source |
|---|---|---|---|---|---|
| W9127N26BA024 Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement | Solicitation | Aug 19, 2026 | Sep 18, 2026 3:00 PM GMT-0700 | Active | View on SAM.gov |
| W9127N26BA024 Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement | Solicitation | Aug 27, 2026 | Sep 18, 2026 3:00 PM GMT-0700 | Active | View on SAM.gov |
| W9127N26BA024 Current Brief record Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement | Solicitation | Aug 28, 2026 | Sep 18, 2026 3:00 PM GMT-0700 | Active | View on SAM.gov |
10 / NAICS and PSC Market Context
How large is the selected comparable market?
Classification codes organize the evidence; they do not prove that every contract in the broader NAICS or PSC market matches this requirement.
11 / Capture Signals and Risks
What should be validated before committing capture resources?
Capture signals separate verified procurement-family evidence from unresolved requirements and market-only indicators.
Direct procurement-family evidence
No direct award record found
Buyer proximity
15 comparable record(s) share the contracting office
Eligibility
Small Business Set Aside - Total
Unresolved requirement fields
6
12 / Who Should Pursue
When does this opportunity fit?
- Your team can demonstrate recent, relevant delivery in bridge replacement, single-span steel girder bridge, Power Line Layout.
- Your company can document the stated eligibility conditions: This is a total small business set-aside.
- You can show credible past performance for W071 ENDIST PORTLAND or a closely related federal customer.
- Your technical scope fits, but you lack demonstrated history with W071 ENDIST PORTLAND.
- You need a specialist teammate to close unresolved staffing, security, or detailed-scope requirements before committing.
- You cannot satisfy or verify the stated eligibility conditions: This is a total small business set-aside.
- The unresolved requirements shown above cannot be validated before committing proposal resources.