GETWAB

01 / Federal Opportunity Brief

Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement

Status
Active
Deadline
Sep 18, 2026 3:00 PM GMT-0700
Solicitation
W9127N26BA024
Updated
Aug 30, 2026
NAICS
237310
PSC
Y1LB

02 / Federal Buyer

Who is buying?

03 / Purchase

What is the government buying?

Requirement

Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement
The current notice is soliciting this requirement from eligible offerors.

Scope available now

The project involves replacing the existing bridge with a new fixed single-span steel girder bridge with a concrete deck, including partial demolition of the existing bridge. The new bridge will be 34’4½” wide with two 11’0” travel lanes, two 2’0” shoulders, and a 5’0” sidewalk. Additional Government Furnished Information (Power Line Layout) is provided for contractor information and must be field verified. The scope is partially confirmed as the full scope details are not provided.

Contract vehicle

Not disclosed in the provided evidence.

How work is assigned

Not disclosed in the provided evidence.

04 / Contracting Requirements

How will this procurement work?

RequirementWhat the notice saysSource status
EligibilityThis is a total small business set-aside.Confirmed
Contract ceilingNot disclosedNot Disclosed
Minimum guaranteeNot disclosedNot Disclosed
Contract durationNot disclosedNot Disclosed
Foreign participationNot disclosedNot Disclosed
Proposal and award procedureNot disclosed in the provided evidence.Not Disclosed
Staffing and securityNot disclosed in the provided evidence.Not Disclosed
Read the original SAM.gov description

*** 27 August 2026 - Amendment W9127N26BA0240001 Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement*** This amendment inserts additional Government Furnished Information (GFI) as an attachment to the solicitation. The file “Power Line Layout” is provided for the Contractor’s information. The Government shall not be responsible for any interpretation of, or conclusion drawn, from the data or information by the Contractor. Information provided should be field verified by the Contractor. If there is a discrepancy between the solicitation plan set and the GFI, the solicitation plan set takes precedence. The project consists of replacing the existing bridge with a new fixed bridge on a new alignment and to provide for partial demolition of the existing bridge. The new fixed bridge will be a single-span steel girder bridge with a concrete deck. The bridge width will be 34’4½” out-to-out, with two 11’0” travel lanes, two 2’0” shoulders, a 5’0” sidewalk, and the superstructure will consist of four (4) built-up steel plate girders. The replacement bridge alignment is located immediately downstream of the existing bridge and, at its northern terminus, will fit entirely between the existing bridge and the Bonneville Power Administration transmission tower which is located to the south. Approach roadways will also be constructed to tie into the existing roadway alignment. The new fixed bridge will be located over the existing navigation channel and will provide an under clearance that is larger than is currently present under the existing bridge. The north abutment will be a concrete stub abutment with spread footing anchored into rock. The south abutment will be a concrete abutment that is supported by drilled shafts. To mitigate seismic hazards, portions of the existing bridge will be removed as part of the bridge construction requirement. The existing bridge provides for critical vehicular access to the Bonneville project that must remain open for the entirety of the construction project. This will likely require the contractor to construct the project in phases. In addition, lead and asbestos removal will be required as part of this requirement. Working within environmental and seasonal restrictions and barge crane lifting will be required in close proximity to a high voltage power line will also be necessary during performance of the required work.

05 / Historical Spending Trend

How has spending on the selected comparable contracts changed?

The same closed fiscal-year window and the same complete comparable-contract set are used throughout this Brief. Net obligations total $8.08M across 7 fiscal years.

Annual net obligations for the selected comparable contract set for this opportunity, classified under NAICS 237310 and PSC Y1LB.
Annual FPDS net obligations for the selected comparable contract set; direct and broad matches are identified separately in the table, and this is not total NAICS or PSC market spending.
Fiscal yearComparable obligationsActionsVendors
FY 2019$5.96M165
FY 2020$847.1K95
FY 2021$233.9K54
FY 2022$169.3K64
FY 2023$138.9K51
FY 2024$395.3K85
FY 2025$335.0K96

06 / Related Historical Awards

Which contracts support the comparison?

No direct contract reference was found. 15 broad matches are shown as supporting context.

Selected historical contracts comparable to this opportunity, ranked by absolute net obligations.
Comparable contracts selected using buyer, office, classification and requirement-language evidence; they are not asserted as predecessors.
ContractVendorLatest activityOfficeNAICS / PSCMatchObligationsActions
W9127N19C0003NORTHBANK CIVIL AND MARINE, INC.Sep 18, 2019W071 ENDIST PORTLAND237990 / Z2KABroad match
Buyer and requirement-language evidence
$1.89M1
W9127N21P0148NEXUS CONTROLS LLCSep 30, 2021W071 ENDIST PORTLAND811211 / J059Broad match
Buyer and requirement-language evidence
$12.3K1
W9127N26PA003COLUMBIA RIVER DISPOSAL, INC.Nov 28, 2025W071 ENDIST PORTLAND562111 / S205Broad match
Buyer and requirement-language evidence
$6.6K1
W9127N24F0115MICROTECHNOLOGIES LLCSep 12, 2024W071 ENDIST PORTLAND334111 / 7G21Broad match
Buyer and requirement-language evidence
$22.1K1
W9127N24P0080AANTILIA LLCAug 21, 2024W071 ENDIST PORTLAND335312 / 6105Broad match
Buyer and requirement-language evidence
$189.0K1
W9127N24P0104SCOFIELD GROUP, LLCAug 9, 2024W071 ENDIST PORTLAND238290 / N099Broad match
Buyer and requirement-language evidence
$49.0K1
W9127N24P0092HYDRO-WATES, INC.Jul 23, 2024W071 ENDIST PORTLAND238290 / N099Broad match
Buyer and requirement-language evidence
$02
W9127N18P0097CROWN POINT REFUSE & RECYCLING INCMar 25, 2021W071 ENDIST PORTLAND562111 / S205Broad match
Buyer and requirement-language evidence
$172.4K3
W9127N15C0009RELAY RESOURCESApr 10, 2020W071 ENDIST PORTLAND561720 / S201Broad match
Buyer and requirement-language evidence
-$2.0K2
W9127N15P0031COLUMBIA RIVER DISPOSAL, INC.Mar 28, 2019W071 ENDIST PORTLAND562111 / S205Broad match
Buyer and requirement-language evidence
$21.3K1
W9127N18C0015ANC CUSTODIAL SERVICES, LLCJan 31, 2019W071 ENDIST PORTLAND561730 / S208Broad match
Buyer and requirement-language evidence
$53.8K1
W9127N21C0008CENTRIC ELEVATOR CORP OF OREGON INCDec 31, 2025W071 ENDIST PORTLAND811310 / J035Broad match
Buyer and requirement-language evidence
$72.1K1
W9127N25FA017VEOLIA ES TECHNICAL SOLUTIONS, L.L.C.Oct 29, 2025W071 ENDIST PORTLAND562211 / S222Broad match
Buyer and requirement-language evidence
$7.3K2
W9127N25CA043PATTI ENGINEERING INCJun 30, 2025W071 ENDIST PORTLAND423430 / 7B22Broad match
Buyer and requirement-language evidence
$95.9K1
W9127N25PA012T & T MATERIALS INCApr 21, 2025W071 ENDIST PORTLAND332313 / 9535Broad match
Buyer and requirement-language evidence
$13.1K1

07 / Contractor Evidence

Which contractors have performed related work?

Historical contractors are ranked by direct procurement-family evidence and comparable contract activity. The table distinguishes connected holders from broader performers without identifying unverified bidders.

No directly connected predecessor was identified. The companies below are historical performers selected from the comparable contract set; none is identified as a bidder.

Suppliers ranked by net obligations within the selected comparable contract set for this opportunity.
Supplier concentration within the comparable contract set only; ranking does not establish incumbency or intent to bid.
CompanyEvidenceFitWhy includedContractsActionsObligationsLatest activityLinks
NORTHBANK CIVIL AND MARINE, INC.
UEI PUVYFG5N1NH8 · CAGE 73PP1
Broad historical performer
Historical performer
ModerateComparable buyer and requirement history11$1.89MSep 18, 2019GETWAB profile
AANTILIA LLC
UEI M1WNFFFKYSX6 · CAGE 8EQ30
Broad historical performer
Historical performer
ModerateComparable buyer and requirement history11$189.0KAug 21, 2024GETWAB profile
Verified via SAM Entities
Official website
CROWN POINT REFUSE & RECYCLING INC
UEI LL7TVN35A8W5 · CAGE 1QTJ4
Broad historical performer
Historical performer
ModerateComparable buyer and requirement history13$172.4KMar 25, 2021GETWAB profile
Verified via SAM Entities
Official website
PATTI ENGINEERING INC
UEI ZSN3NER7TM93 · CAGE 5TEM8
Broad historical performer
Historical performer
ModerateComparable buyer and requirement history11$95.9KJun 30, 2025GETWAB profile
Verified via SAM Entities
Official website
CENTRIC ELEVATOR CORP OF OREGON INC
UEI KU2AQHM35MQ7 · CAGE 089P4
Broad historical performer
Historical performer
ModerateComparable buyer and requirement history11$72.1KDec 31, 2025GETWAB profile
Verified via SAM Entities
Official website
ANC CUSTODIAL SERVICES, LLC
UEI M4FRXBWPGG21 · CAGE 6UWF0
Broad historical performer
Historical performer
ModerateComparable buyer and requirement history11$53.8KJan 31, 2019GETWAB profile
SCOFIELD GROUP, LLC
UEI KFVEV521GBT8 · CAGE 9XFB5
Broad historical performer
Historical performer
ModerateComparable buyer and requirement history11$49.0KAug 9, 2024GETWAB profile
Verified via SAM Entities
Official website
COLUMBIA RIVER DISPOSAL, INC.
UEI R6KYFQ9FHER6 · CAGE 7B8X9
Broad historical performer
Historical performer
ModerateComparable buyer and requirement history22$27.9KNov 28, 2025GETWAB profile
MICROTECHNOLOGIES LLC
UEI CL69E7KATK59 · CAGE 3TSJ0
Broad historical performer
Historical performer
ModerateComparable buyer and requirement history11$22.1KSep 12, 2024GETWAB profile
Verified via SAM Entities
Official website
T & T MATERIALS INC
UEI G8BEYPJRQQK5 · CAGE 4ETZ7
Broad historical performer
Historical performer
ModerateComparable buyer and requirement history11$13.1KApr 21, 2025GETWAB profile
Verified via SAM Entities
Official website
NEXUS CONTROLS LLC
UEI VTALDFW49638 · CAGE 5YGH0
Broad historical performer
Historical performer
ModerateComparable buyer and requirement history11$12.3KSep 30, 2021GETWAB profile
VEOLIA ES TECHNICAL SOLUTIONS, L.L.C.
UEI NA8DN89KAXY8 · CAGE 3C7H6
Broad historical performer
Historical performer
ModerateComparable buyer and requirement history12$7.3KOct 29, 2025GETWAB profile
Verified via SAM Entities
Official website
RELAY RESOURCES
UEI GCEKTL3BRG91 · CAGE 5S669
Broad historical performer
Historical performer
ModerateComparable buyer and requirement history12-$2.0KApr 10, 2020GETWAB profile
Verified via SAM Entities
Official website
HYDRO-WATES, INC.
UEI YCYZY5NQLTK7 · CAGE 5Y9D6
Broad historical performer
Historical performer
ModerateComparable buyer and requirement history12$0Jul 23, 2024GETWAB profile

08 / Competitive Landscape

How was comparable work competed?

Competition treatment is calculated from exactly the same closed-period contract set used in Sections 5–7. It describes historical actions, not the outcome of this solicitation.

FPDS extent-of-competition categories recorded on the selected comparable contracts.
Competition treatment recorded only on the comparable contract set; it does not predict the outcome of this solicitation.
FPDS treatmentCodeActionsObligationsShare
Full and open after exclusion of sourcesD12$6.57M81.4%
Competed under simplified acquisition proceduresF35$1.47M18.3%
Full and open competitionA1$22.1K0.3%
Not competed under simplified acquisition proceduresG10$8.8K0.1%

09 / Procurement History

How was this opportunity published and updated?

3 SAM.gov notice records were resolved into this procurement family. The chronology shows how the requirement was published and updated.

NoticeTypePostedResponse deadlineStatusOfficial source
W9127N26BA024
Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement
SolicitationAug 19, 2026Sep 18, 2026 3:00 PM GMT-0700ActiveView on SAM.gov
W9127N26BA024
Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement
SolicitationAug 27, 2026Sep 18, 2026 3:00 PM GMT-0700ActiveView on SAM.gov
W9127N26BA024
Current Brief record
Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement
SolicitationAug 28, 2026Sep 18, 2026 3:00 PM GMT-0700ActiveView on SAM.gov

10 / NAICS and PSC Market Context

How large is the selected comparable market?

Classification codes organize the evidence; they do not prove that every contract in the broader NAICS or PSC market matches this requirement.

Comparable obligations$8.08M
Comparable contracts15
Historical suppliers14
CoverageFY 2019–FY 2025

11 / Capture Signals and Risks

What should be validated before committing capture resources?

Capture signals separate verified procurement-family evidence from unresolved requirements and market-only indicators.

Watch

Direct procurement-family evidence

No direct award record found

Strong

Buyer proximity

15 comparable record(s) share the contracting office

Moderate

Eligibility

Small Business Set Aside - Total

Watch

Unresolved requirement fields

6

12 / Who Should Pursue

When does this opportunity fit?

Pursue if
  • Your team can demonstrate recent, relevant delivery in bridge replacement, single-span steel girder bridge, Power Line Layout.
  • Your company can document the stated eligibility conditions: This is a total small business set-aside.
  • You can show credible past performance for W071 ENDIST PORTLAND or a closely related federal customer.
Partner if
  • Your technical scope fits, but you lack demonstrated history with W071 ENDIST PORTLAND.
  • You need a specialist teammate to close unresolved staffing, security, or detailed-scope requirements before committing.
Pass or investigate further if
  • You cannot satisfy or verify the stated eligibility conditions: This is a total small business set-aside.