03 / Purchase

What is the government buying?

Requirement

Electric Power Resiliency Building 56
The current notice is soliciting this requirement from eligible offerors.

Scope available now

Contractor must provide all labor, supervision, materials, tools, and equipment to design and modify the existing electrical system to include a 500 KW AC roof-mounted solar photovoltaic system for Building 56. The PV hardware/services must meet/exceed local, state, and utility requirements, conform to applicable codes and standards, and have passed listing/qualification tests. Design and installation must comply with the most recent versions of the referenced documents. Final on-site PV system design responsibility is on the contractor based on site conditions, roofing materials, and final component selections. (Statement of Work is added via Attachment 2.)

Contract vehicle

This is a combined synopsis/solicitation prepared for commercial products or commercial services under FAR Part 12.

How work is assigned

The notice does not describe any task/delivery-order ordering mechanism; it states the contractor will provide the required design and modification work for Building 56 at the specified location.

04 / Contracting Requirements

How will this procurement work?

RequirementWhat the notice saysSource status
EligibilityThe solicitation is set aside as a total Small Business Set Aside.Confirmed
Contract ceilingNot disclosedNot Disclosed
Minimum guaranteeNot disclosedNot Disclosed
Contract durationNot disclosedNot Disclosed
Foreign participationNot disclosedNot Disclosed
Proposal and award procedureThe provided evidence does not include proposal submission instructions or evaluation factors/scoring details.Not Disclosed
Staffing and securityThe provided evidence does not state any specific staffing plan requirements or security/clearance requirements.Not Disclosed
Read the original SAM.gov description

Amendment 0001 is being issued to add Attachment 2, which is the Statement of Work. This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with part 12 to accomplish at the Defense Distribution San Joaquin California. Contractor is to provide all labor, supervision, materials, tools, and equipment to design and modify the existing electrical system to include 500 KW AC roof mounted solar photovoltaic system for building 56. but not limited to: The solar photovoltaic (PV) system hardware and services shall meet or exceed all local, State and utility requirements, conform to the applicable codes and standards, and have passed the listing and qualification tests. All design and installation shall comply with the most recent version of each document. The final design of the on-site PV systems shall be the responsibility of the Contractor based on site conditions, roofing materials, and final system component selections by the Contractor. The systems must be compliant with applicable design guidelines. This Section identifies the minimum technical and installation specifications required. The PV systems shall be consistent with and adhere to all California Building Codes and standards, the California Solar Initiative program, and any and all CEC technical and installation specifications and guidelines. There is one existing electric substation feeding building 56 with a capacity: 12470/408V, 3000KVA transformer. Switchgear is rated: 4000A bus bar and four existing 1200A frame size circuit breaker spaces are available.

05 / Historical Spending Trend

How has spending on the selected comparable contracts changed?

The same closed fiscal-year window and the same complete comparable-contract set are used throughout this Brief. Net obligations total $2.57M across 2 fiscal years.

Annual net obligations for the selected comparable contract set for this opportunity, classified under NAICS 238210 and PSC Z2GZ.
Annual FPDS net obligations for the selected comparable contract set; direct and broad matches are identified separately in the table, and this is not total NAICS or PSC market spending.
Fiscal yearComparable obligationsActionsVendors
FY 2020$18.6K41
FY 2025$2.55M21

06 / Related Historical Awards

Which contracts support the comparison?

No direct contract reference was found. 2 broad matches are shown as supporting context.

Selected historical contracts comparable to this opportunity, ranked by absolute net obligations.
Comparable contracts selected using buyer, office, classification and requirement-language evidence; they are not asserted as predecessors.
ContractVendorLatest activityOfficeNAICS / PSCMatchObligationsActions
SP330025C0008CAITKLAIRE ENERGY SYSTEMS CORPDec 12, 2025DLA DISTRIBUTION238210 / Z2GZBroad match
Buyer and requirement-language evidence
$2.55M2
SP330020P0681CONSTRUCTICON CORPSep 24, 2020DLA DISTRIBUTION334515 / 6150Broad match
Buyer and requirement-language evidence
$18.6K4

07 / Contractor Evidence

Which contractors have performed related work?

Historical contractors are ranked by direct procurement-family evidence and comparable contract activity. The table distinguishes connected holders from broader performers without identifying unverified bidders.

No directly connected predecessor was identified. The companies below are historical performers selected from the comparable contract set; none is identified as a bidder.

Suppliers ranked by net obligations within the selected comparable contract set for this opportunity.
Supplier concentration within the comparable contract set only; ranking does not establish incumbency or intent to bid.
CompanyEvidenceFitWhy includedContractsActionsObligationsLatest activityLinks
CAITKLAIRE ENERGY SYSTEMS CORP
UEI FL97CGAJH173 · CAGE 9X6M2
Broad historical performer
Historical performer
ModerateComparable buyer and requirement history12$2.55MDec 12, 2025GETWAB profile
Verified via SAM Entities
Official website
CONSTRUCTICON CORP
UEI W6M3XXWQGG15 · CAGE 69PJ6
Broad historical performer
Historical performer
ModerateComparable buyer and requirement history14$18.6KSep 24, 2020GETWAB profile
Verified via SAM Entities
Official website

08 / Competitive Landscape

How was comparable work competed?

Competition treatment is calculated from exactly the same closed-period contract set used in Sections 5–7. It describes historical actions, not the outcome of this solicitation.

FPDS extent-of-competition categories recorded on the selected comparable contracts.
Competition treatment recorded only on the comparable contract set; it does not predict the outcome of this solicitation.
FPDS treatmentCodeActionsObligationsShare
Full and open after exclusion of sourcesD2$2.55M99.3%
Competed under simplified acquisition proceduresF4$18.6K0.7%

09 / Procurement History

How was this opportunity published and updated?

2 SAM.gov notice records were resolved into this procurement family. The chronology shows how the requirement was published and updated.

NoticeTypePostedResponse deadlineStatusOfficial source
SP330027Q0012
Electric Power Resiliency Building 56
Combined Synopsis/SolicitationNov 10, 2026Dec 9, 2026 1:00 PM GMT-0500ActiveView on SAM.gov
SP330027Q0012
Current Brief record
Electric Power Resiliency Building 56
Combined Synopsis/SolicitationNov 12, 2026Dec 9, 2026 1:00 PM GMT-0500ActiveView on SAM.gov

10 / NAICS and PSC Market Context

How large is the selected comparable market?

Classification codes organize the evidence; they do not prove that every contract in the broader NAICS or PSC market matches this requirement.

Comparable obligations$2.57M
Comparable contracts2
Historical suppliers2
CoverageFY 2020–FY 2025

11 / Capture Signals and Risks

What should be validated before committing capture resources?

Capture signals separate verified procurement-family evidence from unresolved requirements and market-only indicators.

Watch

Direct procurement-family evidence

No direct award record found

Strong

Buyer proximity

2 comparable record(s) share the contracting office

Moderate

Eligibility

Small Business Set Aside - Total

Watch

Unresolved requirement fields

6

12 / Who Should Pursue

When does this opportunity fit?

Pursue if
  • Your team can demonstrate recent, relevant delivery in Electric Power Resiliency Building 56.
  • Your company can document the stated eligibility conditions: The solicitation is set aside as a total Small Business Set Aside.
  • You can perform under the stated acquisition model: This is a combined synopsis/solicitation prepared for commercial products or commercial services under FAR Part 12.
  • You can show credible past performance for DLA DISTRIBUTION or a closely related federal customer.
Partner if
  • Your technical scope fits, but you lack demonstrated history with DLA DISTRIBUTION.
  • You need a specialist teammate to close unresolved staffing, security, or detailed-scope requirements before committing.
Pass or investigate further if
  • You cannot satisfy or verify the stated eligibility conditions: The solicitation is set aside as a total Small Business Set Aside.
  • Your delivery model cannot support the stated contract vehicle or order-based work structure.
  • The unresolved requirements shown above cannot be validated before committing proposal resources.