01 / Federal Opportunity Brief
Electric Power Resiliency Building 56
02 / Federal Buyer
Who is buying?
03 / Purchase
What is the government buying?
Electric Power Resiliency Building 56
The current notice is soliciting this requirement from eligible offerors.
Contractor must provide all labor, supervision, materials, tools, and equipment to design and modify the existing electrical system to include a 500 KW AC roof-mounted solar photovoltaic system for Building 56. The PV hardware/services must meet/exceed local, state, and utility requirements, conform to applicable codes and standards, and have passed listing/qualification tests. Design and installation must comply with the most recent versions of the referenced documents. Final on-site PV system design responsibility is on the contractor based on site conditions, roofing materials, and final component selections. (Statement of Work is added via Attachment 2.)
This is a combined synopsis/solicitation prepared for commercial products or commercial services under FAR Part 12.
The notice does not describe any task/delivery-order ordering mechanism; it states the contractor will provide the required design and modification work for Building 56 at the specified location.
04 / Contracting Requirements
How will this procurement work?
| Requirement | What the notice says | Source status |
|---|---|---|
| Eligibility | The solicitation is set aside as a total Small Business Set Aside. | Confirmed |
| Contract ceiling | Not disclosed | Not Disclosed |
| Minimum guarantee | Not disclosed | Not Disclosed |
| Contract duration | Not disclosed | Not Disclosed |
| Foreign participation | Not disclosed | Not Disclosed |
| Proposal and award procedure | The provided evidence does not include proposal submission instructions or evaluation factors/scoring details. | Not Disclosed |
| Staffing and security | The provided evidence does not state any specific staffing plan requirements or security/clearance requirements. | Not Disclosed |
Read the original SAM.gov description
Amendment 0001 is being issued to add Attachment 2, which is the Statement of Work. This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with part 12 to accomplish at the Defense Distribution San Joaquin California. Contractor is to provide all labor, supervision, materials, tools, and equipment to design and modify the existing electrical system to include 500 KW AC roof mounted solar photovoltaic system for building 56. but not limited to: The solar photovoltaic (PV) system hardware and services shall meet or exceed all local, State and utility requirements, conform to the applicable codes and standards, and have passed the listing and qualification tests. All design and installation shall comply with the most recent version of each document. The final design of the on-site PV systems shall be the responsibility of the Contractor based on site conditions, roofing materials, and final system component selections by the Contractor. The systems must be compliant with applicable design guidelines. This Section identifies the minimum technical and installation specifications required. The PV systems shall be consistent with and adhere to all California Building Codes and standards, the California Solar Initiative program, and any and all CEC technical and installation specifications and guidelines. There is one existing electric substation feeding building 56 with a capacity: 12470/408V, 3000KVA transformer. Switchgear is rated: 4000A bus bar and four existing 1200A frame size circuit breaker spaces are available.
05 / Historical Spending Trend
How has spending on the selected comparable contracts changed?
The same closed fiscal-year window and the same complete comparable-contract set are used throughout this Brief. Net obligations total $2.57M across 2 fiscal years.

| Fiscal year | Comparable obligations | Actions | Vendors |
|---|---|---|---|
| FY 2020 | $18.6K | 4 | 1 |
| FY 2025 | $2.55M | 2 | 1 |
06 / Related Historical Awards
Which contracts support the comparison?
No direct contract reference was found. 2 broad matches are shown as supporting context.

| Contract | Vendor | Latest activity | Office | NAICS / PSC | Match | Obligations | Actions |
|---|---|---|---|---|---|---|---|
| SP330025C0008 | CAITKLAIRE ENERGY SYSTEMS CORP | Dec 12, 2025 | DLA DISTRIBUTION | 238210 / Z2GZ | Broad match Buyer and requirement-language evidence | $2.55M | 2 |
| SP330020P0681 | CONSTRUCTICON CORP | Sep 24, 2020 | DLA DISTRIBUTION | 334515 / 6150 | Broad match Buyer and requirement-language evidence | $18.6K | 4 |
07 / Contractor Evidence
Which contractors have performed related work?
Historical contractors are ranked by direct procurement-family evidence and comparable contract activity. The table distinguishes connected holders from broader performers without identifying unverified bidders.
No directly connected predecessor was identified. The companies below are historical performers selected from the comparable contract set; none is identified as a bidder.

| Company | Evidence | Fit | Why included | Contracts | Actions | Obligations | Latest activity | Links |
|---|---|---|---|---|---|---|---|---|
| CAITKLAIRE ENERGY SYSTEMS CORP UEI FL97CGAJH173 · CAGE 9X6M2 | Broad historical performer Historical performer | Moderate | Comparable buyer and requirement history | 1 | 2 | $2.55M | Dec 12, 2025 | GETWAB profile Verified via SAM Entities Official website |
| CONSTRUCTICON CORP UEI W6M3XXWQGG15 · CAGE 69PJ6 | Broad historical performer Historical performer | Moderate | Comparable buyer and requirement history | 1 | 4 | $18.6K | Sep 24, 2020 | GETWAB profile Verified via SAM Entities Official website |
08 / Competitive Landscape
How was comparable work competed?
Competition treatment is calculated from exactly the same closed-period contract set used in Sections 5–7. It describes historical actions, not the outcome of this solicitation.

| FPDS treatment | Code | Actions | Obligations | Share |
|---|---|---|---|---|
| Full and open after exclusion of sources | D | 2 | $2.55M | 99.3% |
| Competed under simplified acquisition procedures | F | 4 | $18.6K | 0.7% |
09 / Procurement History
How was this opportunity published and updated?
2 SAM.gov notice records were resolved into this procurement family. The chronology shows how the requirement was published and updated.
| Notice | Type | Posted | Response deadline | Status | Official source |
|---|---|---|---|---|---|
| SP330027Q0012 Electric Power Resiliency Building 56 | Combined Synopsis/Solicitation | Nov 10, 2026 | Dec 9, 2026 1:00 PM GMT-0500 | Active | View on SAM.gov |
| SP330027Q0012 Current Brief record Electric Power Resiliency Building 56 | Combined Synopsis/Solicitation | Nov 12, 2026 | Dec 9, 2026 1:00 PM GMT-0500 | Active | View on SAM.gov |
10 / NAICS and PSC Market Context
How large is the selected comparable market?
Classification codes organize the evidence; they do not prove that every contract in the broader NAICS or PSC market matches this requirement.
11 / Capture Signals and Risks
What should be validated before committing capture resources?
Capture signals separate verified procurement-family evidence from unresolved requirements and market-only indicators.
Direct procurement-family evidence
No direct award record found
Buyer proximity
2 comparable record(s) share the contracting office
Eligibility
Small Business Set Aside - Total
Unresolved requirement fields
6
12 / Who Should Pursue
When does this opportunity fit?
- Your team can demonstrate recent, relevant delivery in Electric Power Resiliency Building 56.
- Your company can document the stated eligibility conditions: The solicitation is set aside as a total Small Business Set Aside.
- You can perform under the stated acquisition model: This is a combined synopsis/solicitation prepared for commercial products or commercial services under FAR Part 12.
- You can show credible past performance for DLA DISTRIBUTION or a closely related federal customer.
- Your technical scope fits, but you lack demonstrated history with DLA DISTRIBUTION.
- You need a specialist teammate to close unresolved staffing, security, or detailed-scope requirements before committing.
- You cannot satisfy or verify the stated eligibility conditions: The solicitation is set aside as a total Small Business Set Aside.
- Your delivery model cannot support the stated contract vehicle or order-based work structure.
- The unresolved requirements shown above cannot be validated before committing proposal resources.